Website of the ALADIN Consortium
Most recent articles
-
25th ALADIN General Assembly and 6th joint ALADIN GA and HIRLAM Council, 25-26 June 2020
7 April 2020, by PatriciaThe ALADIN Directors should have met on 25 of June 2020 in Barcelona for the 25th ALADIN General Assembly and on 26 of June with the HIRLAM Council for the 6th joint meeting of the ALADIN General Assembly and HIRLAM Council. These meetings took place as planned, but on video-conference format. Below are the agenda of these meetings. The documents for the single ALH Consortium, as adopted by the 6th joint ALADIN GA and HIRLAM Council, are available below (versions finalized on 1st of July (…) -
Joint 30th ALADIN Workshop and HIRLAM ASM 2020, 30/03-03/04/2020, visio-conference
25 March 2020, by Patricia[*The in-situ meeting is cancelled (the Slovenian Environment Agency (ARSO) should have hosted the joint 30th ALADIN Workshop & HIRLAM ASM 2020 in Ljubljana, from March 30 to April 4 2020*] at Austria Trend Hotel Ljubljana and on Friday morning at Slovenian Environment Agency (ARSO). [*The meetings was organised by videoconference*] and the agenda has been adapted to the video-conference format. All times are given in CEST (UTC+2). [** ALADIN LTM meeting on Tuesday 31 at 11:00*] (…) -
ALADIN staff in Slovakia
10 March 2020, by Eric, JAM, PatriciaSLOVENSKà HYDROMETEOROLOGICKà ÚSTAV Jeséniova 17 P.O. Box 15 83 315 BRATISLAVA REPUBLIQUE SLOVAQUE www.shmu.sk PhotoSURNAMEfirstnameTELEPHONETELECOPYe-mail BELLUS MARTIN 421 2 59 415 382 421 2 54 77 43 74 martin.bellus*a*shmu.sk BENKO MARTIN 421 2 59 415 369 421 2 54 77 43 74 martin.benko*a*shmu.sk CATLOSOVA KATARINA katarina.catlosova*a*shmu.sk DERKOVA MARIA 421 2 59 415 380 421 2 54 77 43 74 maria.derkova*a*shmu.sk DIAN MARTIN 421 2 59 415 490 421 2 54 774 374 (…) -
Stay reports 2019
31 January 2020, by EricAMBAR A.: Studies on the latest development in ARPEGE/IFS (CY47T1): Focus on single precision tests AMBAR A.: Desert dusts aerosols and microphysics interaction in AROME: Initialization of ice freezing nuclei in LIMA scheme EL KAROUNI K.: Diagnostic de densité d’éclairs dans le cy46t1 du modèle Arome KHALFAOUI W.: Optimization of Blendvar at 2.3 km MARASS N.: Diagnostics de sortie du modèle: évaluation du nouveau diagnostic de visibilité, test de l’interpolation à 4 points dans FULLPOS (…) -
Technical visio-conferences
27 January 2020, by PatriciaTechnical video-conference on phasing methods : 18 June 2020 Technical video-conference on code adaptations to new HPC architecture : 15 June 2020 Technical video-conference : 21 January 2020 Technical video-conference : 19 November 2019 Technical video-conference : 3 July 2019 Technical video-conference : 16 October 2018 Technical video-conference : 7 June 2018 Technical video-conference : 6 February 2018 Technical video-conference on Thursday 7 December 2017 Technical video-conference : (…) -
ALADIN staff in Hungary
10 January 2020, by Eric, JAM, PatriciaHUNGARY ORSZà GOS METEOROLÓGIAI SZOLGà LAT KITAIBEL Pà L UTCA 1 - PO BOX 38 H-1024 BUDAPEST HONGRIE www.met.hu GMT + 1 PhotoSURNAMEfirstnameTELEPHONETELECOPYe-mail BAN Beatrix +36 1 346 4613 ban.b*a*met.hu HOMONNAI Viktoria homonnai.v*a*met.hu JAVORNE Radnoczi Katalin +36 1 346 4651 radnoczi.k*a*met.hu KULLMANN LASZLO +36 1 346 4790 +36 1 346 46 29 kullmann.l*a*met.hu SUGA Réka +36 1 346 4894 suga.r*a*met.hu SZANYI Kristof +36 1 346 4784 szanyi.k*a*met.hu SZEPSZO (…) -
Visitors in Toulouse in 2020
7 January 2020, by PatriciaThe first list of the 2020 visitors in Toulouse is given below. Please consult the offices table for phone number and office number of the 2020 visitors. NAMEFIRSTNAMECOUNTRYSTARTENDSubjectMENTOR THOMAS Guillaume FRANCE 01/10/17 30/09/20 DPOL Radar data assimilation MAFHOUF/ WATTRELOT DESTOUCHES Mayeul FRANCE 01/10/17 30/09/20 Assimilation des hydrométéores dans l’ENVar AROME MONTMERLE/ MICHEL ALEKSOVSKA Ivana MACEDONIA 04/11/17 01/11/20 Améliorer les prévisions à court et moyen (…) -
List of (General) Assemblies of ALADIN Partners
6 January 2020, by PatriciaGeneral Assemblies of ALADIN Partners Since the 3rd MoU (November 2005), the governance of the ALADIN project is under the responsibility of the General Assembly. In 2014, for the first time, a joint ALADIN General Assembly and HIRLAM Council meeting was hold (on December 2 afternoon, after the morning ALADIN General Assembly). G.A. Dates Place regular 26th General Assembly and 7th joint ALADIN GA and HIRLAM Council November 26-27, 2020 France regular 25th General Assembly and 6th (…) -
Stay reports 2018
13 December 2019, by EricAMBAR A.: Studies on the latest developments in ARPEGE/IFS (CY46) DEHMOUS I.: Developement of a model based radar Doppler wind generator for de-aliasing and validation purpose EL KAROUNI K.: Évaluation de l’effet de rétroaction sur la température dans Lima dans le modèle Arome MARASS N. Évaluer la mise en place d’une nouvelle fermeture du schéma de convection peu profonde sur plusieurs configurations du modèle Arome afin d’améliorer la prévision des nuages dans les basses (…) -
A-L-H Strategy meeting, Toulouse, 3-4 February 2020
29 November 2019, by PatriciaOne of the elements of the preparations for the merge between HIRLAM and ALADIN will be to establish a common set of strategic objectives for the new ALADIN-LACE-HIRLAM consortium. These strategic objectives will be of two kinds: R&D objectives, and an organizational objective: how to achieve a more effective cooperation between members, in particular members which presently work on different CSC’s. Concerning the latter: two elements which, in the view of the PM’s, should facilitate (…)
ALADIN