History (reverse order) of the ALADIN cycles

ALADIN cycle [1] with memorandum [2]available inMajor modifications introduced in the cyclebased on ARPEGE cyclePhasing team
AL40 June 2013 ? ... CY40
AL39T1 early 2013 ? ... CY39T1
AL39 October 2012 ? common with CY38R2+ ; second phase of code overhaul of obs operators CY39 Bogatchev, Jair, Jidane, Tsenova, Spaniel, Szucs
AL38T1 April 2012 Surfex 7.2 ; I/O server ; finalization of code for PCMT ; improvements of ALARO physics ; first steps of Full-POS overhaul CY38T1 Bochenek, Mile, Spaniel
AL38 October 2011 first elements of IFS Fortran code cleaning in the OOPS spirit CY38 Benacek, Bogatchev, Kocaman, Kolonko, Sassi, Spaniel
AL37T1 June 2011 Various code cleanings in the spirit of OOPS; upgrade of the Alaro physics (TOUCANS, CA); Option to remove the E-zone in GP computations (Harmonie); code for handling scatterometer obs; adaptation of configuration 901 to GRIB2 CY37T1 Bucanek, Jerczynski, Jidane, Mile, Spaniel, Szucs, Trojakova
AL37 September 2010 phasing with IFS CY36R4;Catch-up of some late E-suite changes in Arpège and Arome; Blending FA file optimization CY37 Bogatchev, Jidane, Spaniel
AL36T2 August 2010 finalization of the OI code for Surfex-based assimilation, various optimization (esp. for 4D-VAR and 3D-VAR), significant upgrade of the Alaro turbulence scheme CY36T2 Kanit, Kolonko, Spaniel
AL36T1 December 2009 Emissivity and surface temperature in control vector for assimilation of radiances over land; Surfex V5 in AROME CY36T1 Bergaoui, Dziedzic, Spaniel, Woyciechowska
AL36 June 2009 Phasing with IFS CY35R3 CY36 Bogatchev, Kolonko, Essaouini
AL35T2 January 2009 - CY35T2 -
AL35T1 November 2008 Scale selective DFI; various cleaning & optimisation features for vectorial platforms CY35T1 Dziedzic, Masek, Razagui, Spaniel
AL35 September 2008 Library reorganisation, RTTOV-9 CY35 -
AL34 August 2008 Phasing with IFS CY33R2 CY34 Bogatchev, Dziedzic, Jidane, Lelatko, Mladek
AL33T1 May 2008 AROME pre-operational physics version; implicit coupling surface/vertical diffusion for ALARO-0 CY33T1 Kral, Stanesic
AL33T0 February 2008 VarBC adaptations for Aladin CY33T0 -
AL33 December 2007 some fullpos optimization; phasing with IFS CY32R3 CY33 Benamara, Bogatchev, Csomos, Nmiri, Spaniel
AL32T3 October 2007 ALARO-0 physics update; radar data assimilation (radial wind screening, 1D-Bayesian inversion) CY32T3 -
AL32T2 July 2007 SL-AD ; preparation for IASI and other future ARPEGE developments CY32T2 Dziedzic, Jidane, Lelatko
AL32T1 April 2007 ALARO-0 physics CY32T1 El Ouaraini, Ivatek-Sahdan
AL32T0 January 2007 buxfixes for 3D-VAR CY32T0 -
AL32 December 2006 New surface data structure, ALARO0 physics CY32 Bogatchev, Boloni, El Ouaraini, Jurasek, Razagui
AL31T2 September 2006 SL-TL in ALADIN CY31T2 -
AL31T1 July 2006 HIRLAM physics, surfex in ALADIN CY31T1 Ivatek-Sahdan, Jerczynski, Trojakova
AL31 April 2006 Surfex under NPROMA loop, rewrinting of GFL attributes CY31 Bogatchev, Dziedzic, El Ouaraini, Hamdi, Jidane, Kovacic,Zaaboul
AL30T1) December 2005 NH cleaning CY30T1 Bouzouita, Cedilnik, Dziedzic, Pistotnik
AL30 July 2005 New GOM structure; Jb wavelet reactivated at ECMWF CY30 Bogatchev, Janousek, Jerczynski, Spaniel, Zaaboul
AL29T3 April 2005 Miscellaneous bugfixes CY29T2 "internal" phasing with only GMAP people
AL29T2 April 2005 AROME prototype; NH code reorganisation; Jk; rotated Mercator; 3TL PC CY29T2 Bouzouita, Dziedzic, Vivolda
AL29T1 February 2005 SLHD; radar tables; SEVIRI radiance assimilation CY29T1 Bogatchev, Bouzouita, Deckmyn, Ivateks-Sahdan, Soci, Spaniel, Trojakova, Vana
AL28T1 May 2004 Major development cycle CY28T1 Boloni, Dziedzic, Tudor
AL28T0 February 2004 Aladin runs on CY28 !! Explicit interfaces CY28T0 id.
AL28 Autumn 2003 new coding standards Explicit interfaces CY28 Bogatchev, Moussy, Radnoti, Sahlaoui, Tudor, Zaaboul
AL27 Autumn 2003 New data flow in the core of the model (GMV/GFL) CY27 id.
AL26T1 July 2003 New distributed-memory data layout for control variable Incremental transform package B-level and LSPLIT still bugged New coupling data layout Coupling call extracted from TAL IFS features (cleaning NNMI) Fullpos B-level CY26T1 Bogatchev, Dziedzic, Soci, Spaniel, Termonia
AL25T1 (*) Autumn 2002 New NHS variables work around P/C scheme assimilation of raw radiances new EGGX adaptation to split CPG CY25T1 Ahrens, Bogatchev, Boloni, Jerczynski, Masek, Moussy, Randriamampianina, Sahlaoui, Sbii, Smith, Smolikova, Vivoda
AL15 July 2001 External spectral transform package Merget control routines with ARPEGE/IFS ODB structure for data assimilation "op2" physics (modified code, no reproducibility of CYCORA) CY24T1 Da Costa, Gaytandjieva, Ivatek-Sahdan, Janousek, Radnoti, Szczech
- post-phasing AL15 : Bogatchev, Deckmyn, Spiridonov
AL14 November 2000 New developments in Full-Pos New data flow for non-hydrostatic CY23T1 Brozkova, Gospodinov, Mladek, Randriamampianina, Szczech, Wang
AL13 July 2000 Predictor-Corrector skeleton Consistent loop on TL/AD gridpoint computations Snow analysis CY22T2 Masek, Sadiki, Soci, Vivoda, Zagar, Zitouni
AL12 January 2000 Pruning New developments in Full-Pos New hydrostatic TL/AD Cleaning in SL code CY22 T1 Ajjaji, Bellus, Gaytandjieva, Gospodinov, Haddouch, Jerman, Radnoti
AL11 T2 September 1999 3D-Var TL+AD in distributed memory 2D model. CY21 T2
AL11 June 1999 Free-source format, implicit-none statement. CY21 T1 Neytchev, Sadiki, Zitouni
AL10 February 1999 Clean and fully validated cycle with correct treatment of the extension zone. CY20 id.
AL09 July 1998 Cleaning for distributed memory. New solution for 2TL/SL instability. CY19 T1 Gérard, Gospodinov, Neytchev, Siroka, Soci, Zitouni
AL08 T3 April 1998 Porting to VPP. CY18 T3
AL08 February 1998 ISBA, true Fortran 90. CY18 T1 Ajjaji, Boutahar, Dvorak, Madeira, Neytchev, Siroka, Soci
AL07 August 1997 Modifications necessary to run ALADIN on distributed memory. Workstation version cleanly branched. CY16 T1 Brozkova, Dvorak, El Abed, Horanyi, Janiskova, Radnoti, Siroka
AL06 April 1997 The "doomed" VALPARAISO cycle. CY15 T2 Boutahar, Brozkova, Dvorak, Gérard, Jerczynski, Radnoti
Autumn 1996 Boutahar, Brozkova, Issara, Radnoti
Spring 1996 Ajjaji, Dragulanescu, El Abed, Jerman, Radnoti
AL05 December 1995 Fortran 90. CY14 T3 Bogatchev, Dragulanescu, Zagar
AL04 September 1995 CLAC. CY13 R3 Brozkova, Cordoneanu, Horanyi, Ivanovici, Janousek, Radnoti
AL03 May 1994 CANARI. First pre-operational cycle. Compatibility between LBC and SI. CY12 Ajjaji, Banciu, Brozkova, Horanyi, Issara, Ivanovici, Janousek, Radnoti, Von Der Emde
AL02 December 1993 Semi-Lagrangian. CY11 Brozkova, Cordoneanu
AL01 July 1993 Digital Filter Initialisation. CY10 Cordoneanu, Radnoti
AL00 October 1992 Allowing first full forecasting tests. CY9 Brozkova, Horanyi, Ivanovici

 Patricia 



[1] In spring 2002, the ALADIN cycles have experienced a tremendous jump in their numbering: cycle 15 was phased directly to 25T1, meaning 10 ALADIN cycles created in only 2 months !.. More seriously, this jump is simply due to the new rule, which states that the ALADIN cycles should have the same numbering than their ARPEGE counterpart.

[2] the technical memorandum are available from AL30T1 for partners only.

Navigation

Editorial follow-up | Site map |  Kiosk Web |  Contact  

Other articles


Decontaminated forum